Sample inspection report

This is the format we deliver after an on-site inspection — a checklist scored against your specification, findings with photo evidence, and a plain-language verdict you can act on before releasing payment.

Everything below uses placeholder names and invented findings. It is a format illustration only — not a record of any real inspection or client.

Request an inspection What's included
Sample — for format illustration only Not a record of a real inspection. All names, values, and findings below are invented placeholders.
SAMPLE · SAMPLE · SAMPLE
CX CXRT Co.

Factory Inspection Report

Report no. SAMPLE‑0000

Inspection date [DD Mon YYYY]

Issued [DD Mon YYYY]

Inspector [Name], CXRT Co.

ClientSample Co. Ltd. (placeholder)Client PO ref.PO‑SAMPLE‑001
ManufacturerSample Manufacturer Co., Ltd. (placeholder)Factory location[City], [Province], China
Product[Equipment / component description]Order quantity[N] units
Inspection typeDuring production / pre-shipmentReference documentsSpec sheet rev. [x], GA drawing [no.], approved sample
Conditional pass

Ship after the two minor findings below are corrected and re-photographed.

Quantity and core specification conform. Two minor issues were found — a missing corrosion-protection coat on four brackets, and export packaging that is not yet crated for sea freight. Neither affects function; both are quick corrections. We recommend holding balance payment until the factory sends corrected photos, which we will verify remotely at no extra charge.

Checklist

CheckNotesResult
Quantity vs. purchase orderFull count completed; matches PO quantityPass
Model / part number & markingsNameplate data matches order; serials recordedPass
Key dimensions vs. drawingSampled [n] units; all within tolerancePass
Material / certificate checkMill certs sighted and photographed; match specPass
Surface / corrosion protection4 of 24 brackets missing final coatMinor
Function / acceptance test witnessedNo-load run and pressure test observed; results loggedPass
WorkmanshipWelds and finish acceptable; minor tooling marks notedPass
Packaging for exportUnits wrapped but not yet crated for sea freightMinor
Shipping marks & labellingNot yet applied at time of visitPending
Export documents on filePacking list drafted; commercial invoice pendingPending

Findings & evidence

Photo placeholder
geo-tagged & timestamped
Finding 1 — Minor. Four brackets without final corrosion coat. Factory to re-coat and re-photograph.
Photo placeholder
geo-tagged & timestamped
Finding 2 — Minor. Goods wrapped on pallets but not crated. Confirm crating before shipment.
Photo placeholder
geo-tagged & timestamped
Reference. Nameplate / serial number, photographed against the order.
Photo / short video placeholder
geo-tagged & timestamped
Acceptance test. Function test witnessed on the floor; gauge readings recorded.

Recommendation

Do not release the balance payment yet. Ask the factory to (1) apply the missing corrosion coat, (2) crate the units for sea freight, and (3) apply shipping marks per your instructions. Have them send photos of all three; CXRT Co. will verify remotely and issue a one-page closure note. Estimated correction time: 2–3 working days.

Methodology & limitations (sample text). Inspection carried out on-site against the reference documents listed above, using sampling for dimensional and cosmetic checks and 100% checking for quantity. Findings reflect the condition of the goods at the time and place of the visit only. This report is not a guarantee of the goods and does not transfer liability for the manufacturer's performance. On a real engagement, CXRT Co.'s liability is limited as set out in the signed service agreement. — This document is a format sample; see the notice at the top.